Wind farm Borssele III/IV
Location: Borssele
Client: Blauwwind
Service: Contract Management
Scope: 731.5 MW

Construction of the Borssele III / IV wind farm with a total capacity of 731.5 MW, which corresponds to the energy consumption of about 825,000 households.

De Nieuwe WarmteWeg
Location: Rotterdam
Client: Warmte Bedrijf Rotterdam
Service: Project monitoring
Scope: 2 x 26 km

Construction of a residual heat pipeline of 26 km through an urban area. The Nieuwe Warmteweg is the heating network between the industries of Rozenburg and Rotterdam. DNWW has allowed 50,000 household to be heated by residual heat. Part of the construction is the controlled bore (1.5 km) beneath Katendrecht, including Meuse and the Rhine Harbour.

Biomass
Location: Rotterdam Maasvlakte
Client: Engie Nederland
Service: Tender management
Scope: 800 MW

Invitation to tender issued for a biomass co-firing installation for a coal-fired power station. Engie Nederland expands its coal plant to the Maasvlakte using a biomass installation so that in the long term, a switch could be made to heating fully on biomass.

Biomass
Location: Rotterdam Maasvlakte
Client: Uniper
Service: Project monitoring
Scope: 1100 MW

Expansion of the Uniper centre with the installation allowing residual flows from the surrounding industry to be co-fired.

De Nieuwe WarmteWeg Location: Rotterdam Client: Warmte Bedrijf Rotterdam Service: Project monitoring Scope: 2 x 26 km Construction of a residual heat pipeline of 26 km through an urban area. The Nieuwe Warmteweg is the heating network between the industries of Rozenburg and Rotterdam. DNWW has allowed 50,000 household to be heated by residual heat. Part of the construction is the controlled bore (1.5 km) beneath Katendrecht, including Meuse and the Rhine Harbour.
Biomass Location: Rotterdam Maasvlakte Client: Uniper Service: Project monitoring Scope: 1100 MW Expansion of the Uniper centre with the installation allowing residual flows from the surrounding industry to be co-fired.
Biomass Location: Rotterdam Maasvlakte Client: Engie Nederland Service: Tender management Scope: 800 MW Invitation to tender issued for a biomass co-firing installation for a coal-fired power station. Engie Nederland expands its coal plant to the Maasvlakte using a biomass installation so that in the long term, a switch could be made to heating fully on biomass.
Wind farm Borssele III/IV Location: Borssele Client: Blauwwind Service: Contract Management Scope: 731.5 MW Construction of the Borssele III / IV wind farm with a total capacity of 731.5 MW, which corresponds to the energy consumption of about 825,000 households.