Reerences Infrastructure
Vijverberg works on high-profile projects in the infrastructue. We deploy our specialists over the entire project cycle. See our projects in hydrogen storage, renewable energy, food, energy, petrochemical, transport & logistics and oil & gas.
Location: Amsterdam
Client: VIA & Dienst Metro & Tram Amsterdam
Service: Project monitoring
Scope: 10 km
The ‘North-South line’ is the new connection between Amsterdam North and Amsterdam South. Seven new stations were planned in the medium term, five of which underground. This large-scale project involves many different parties, which requires proper coordination.
” dnxtiel_image_hover_effect=”slide-up” dnxtiel_hover_bg=”rgba(30,60,122,0.86)” _builder_version=”4.16″ dnxt_body_text_color=”#ffffff” custom_margin=”||15px||false|false” custom_padding=”0px||0px||false|false” global_colors_info=”{}”][/dnxtiel_next_image_effect][dnxtiel_next_image_effect dnxtiel_image=”https://vijverberg.com/wp-content/uploads/2020/06/infrastructuur_05.jpg” dnxtiel_heading_tag=”p” dnxtiel_description=”A16/A13 connection
Location: Rotterdam
Client: Strukton
Service: Tender management
Scope: 11 km
Tender for a new motorway. The A16 was connected to the A13 in order to increase the flow on the A13 and A20 around Rotterdam. The new motorway was created between Zestienhoven Airport and the Terbregseplein.
” dnxtiel_image_hover_effect=”slide-up” dnxtiel_hover_bg=”rgba(30,60,122,0.86)” _builder_version=”4.16″ dnxt_body_text_color=”#ffffff” custom_margin=”||||false|false” custom_padding=”0px||0px||false|false” global_colors_info=”{}”][/dnxtiel_next_image_effect][dnxtiel_next_image_effect dnxtiel_image=”https://vijverberg.com/wp-content/uploads/2020/06/infrastructuur_07.jpg” dnxtiel_heading_tag=”p” dnxtiel_description=”Oosterweel Link
Location: Antwerp (BE)
Client: Beheersmaatschappij Antwerpen Mobiel
Service: Tender management
Scope: € 3.25 billion
Procurement of new ring road. The Oosterweel Link completes the Antwerp Ring Road. The Linkeroever, Oosterweel, Groenendaallaan and Schijnpoort intersections will be connected to one another with tunnels and trenches.
” dnxtiel_image_hover_effect=”slide-up” dnxtiel_hover_bg=”rgba(30,60,122,0.86)” _builder_version=”4.16″ dnxt_body_text_color=”#ffffff” custom_margin=”15px||||false|false” custom_padding=”0px||0px||false|false” global_colors_info=”{}”][/dnxtiel_next_image_effect]
Client: Volker Wessels
Service: Tender management
Scope: 19 km
Tender implementation light rail. The current tram/subway connection of the Amstelveen line will be converted into a light rail connection. To achieve this goal, both the track and the stops will be converted. In addition, three level-free crossings will be integrated with the road traffic.
” dnxtiel_image_hover_effect=”slide-up” dnxtiel_hover_bg=”rgba(30,60,122,0.86)” _builder_version=”4.16″ dnxt_body_text_color=”#ffffff” dnxt_body_line_height=”1.1em” custom_margin=”||15px||false|false” custom_padding=”0px||0px||false|false” global_colors_info=”{}”][/dnxtiel_next_image_effect][dnxtiel_next_image_effect dnxtiel_image=”https://vijverberg.com/wp-content/uploads/2020/06/infrastructuur_04.jpg” dnxtiel_heading_tag=”p” dnxtiel_description=”Renovation of Nederrijn Lek weir ensemble
Location: Hagestein, Amerongen & Driel
Client: Siemens Nederland
Service: Tender management
Scope: ± 15,000 ships
Tender for the renovation of three dam and lock complexes in the Nether Rhine and the Lek river. These are crucial for water management in the Netherlands and ensure, for example, that the IJsselmeer remains on a level. In addition to replacing the dams, the operation and control of the complex were renovated.
” dnxtiel_image_hover_effect=”slide-up” dnxtiel_hover_bg=”rgba(30,60,122,0.86)” _builder_version=”4.16″ dnxt_body_text_color=”#ffffff” custom_margin=”||15px||false|false” custom_padding=”0px||0px||false|false” global_colors_info=”{}”][/dnxtiel_next_image_effect][dnxtiel_next_image_effect dnxtiel_image=”https://vijverberg.com/wp-content/uploads/2020/06/infrastructuur_06.jpg” dnxtiel_heading_tag=”p” dnxtiel_description=”Modernisation of the operation of locks and bridges in Zeeland (MOBZ)
Location: Zeeland
Client: Cofely Energy & Infra
Service:Project monitoring
Scope: 2 Nautical Stations and 12 locks and bridges
Renovation and adaptation of locks and bridges and the corresponding command and control systems. In addition, the implementation of remote control via the new nautical centre in Terneuzen.
” dnxtiel_image_hover_effect=”slide-up” dnxtiel_hover_bg=”rgba(30,60,122,0.86)” _builder_version=”4.16″ dnxt_body_text_color=”#ffffff” custom_margin=”||||false|false” custom_padding=”0px||0px||false|false” global_colors_info=”{}”][/dnxtiel_next_image_effect][dnxtiel_next_image_effect dnxtiel_image=”https://vijverberg.com/wp-content/uploads/2020/06/infrastructuur_08.jpg” dnxtiel_heading_tag=”p” dnxtiel_description=”Hart van Zuid
Location: Rotterdam
Client: Ballast Nedam/Heijmans
Service: Project monitoring
Scope: € 200 million
Area development around the Zuidplein and Ahoy. This will be transformed into a versatile area in which culture and sports, shopping and catering, congress and hotel facilities come together in a way that is accessible to all.
” dnxtiel_image_hover_effect=”slide-up” dnxtiel_hover_bg=”rgba(30,60,122,0.86)” _builder_version=”4.16″ dnxt_body_text_color=”#ffffff” custom_margin=”||||false|false” custom_padding=”0px||0px||false|false” global_colors_info=”{}”][/dnxtiel_next_image_effect]

Location: Amsterdam
Client: VIA & Dienst Metro & Tram Amsterdam
Service: Project monitoring
Scope: 10 km
The ‘North-South line’ is the new connection between Amsterdam North and Amsterdam South. Seven new stations were planned in the medium term, five of which underground. This large-scale project involves many different parties, which requires proper coordination.

Client: Volker Wessels
Service: Tender management
Scope: 19 km
Tender implementation light rail. The current tram/subway connection of the Amstelveen line will be converted into a light rail connection. To achieve this goal, both the track and the stops will be converted. In addition, three level-free crossings will be integrated with the road traffic.

Location: Rotterdam
Client: Strukton
Service: Tender management
Scope: 11 km
Tender for a new motorway. The A16 was connected to the A13 in order to increase the flow on the A13 and A20 around Rotterdam. The new motorway was created between Zestienhoven Airport and the Terbregseplein.

Location: Hagestein, Amerongen & Driel
Client: Siemens Nederland
Service: Tender management
Scope: ± 15,000 ships
Tender for the renovation of three dam and lock complexes in the Nether Rhine and the Lek river. These are crucial for water management in the Netherlands and ensure, for example, that the IJsselmeer remains on a level. In addition to replacing the dams, the operation and control of the complex were renovated.

Location: Zeeland
Client: Cofely Energy & Infra
Service:Project monitoring
Scope: 2 Nautical Stations and 12 locks and bridges
Renovation and adaptation of locks and bridges and the corresponding command and control systems. In addition, the implementation of remote control via the new nautical centre in Terneuzen.

Location: Antwerp (BE)
Client: Beheersmaatschappij Antwerpen Mobiel
Service: Tender management
Scope: € 3.25 billion
Procurement of new ring road. The Oosterweel Link completes the Antwerp Ring Road. The Linkeroever, Oosterweel, Groenendaallaan and Schijnpoort intersections will be connected to one another with tunnels and trenches.

Location: Rotterdam
Client: Ballast Nedam/Heijmans
Service: Project monitoring
Scope: € 200 million
Area development around the Zuidplein and Ahoy. This will be transformed into a versatile area in which culture and sports, shopping and catering, congress and hotel facilities come together in a way that is accessible to all.